Stamford Bridge Redevelopment

London, United Kingdom

Exciting design challenges included sinking the stadium to reduce light pollution construction above rail routes and MEP integration

Chelsea demolished their previous home at Stamford Bridge to make space for the new 60,000-seat,  state-of-the-art stadium. Chelsea’s redevelopment project posed exciting design challenges involving excavation to sink the stadium four meters into the ground in order to reduce light pollution of local residents, the construction of new concourse and circulation areas above existing rail routes, and the integration of the MEP services into this iconic architectural vision.

Services

  • Architectural Lighting
  • Assessment/Study
  • Audio Video Systems
  • Bridging Documents
  • Broadcast Infrastructure
  • Building Performance
  • Commissioning Services
  • DAS Cellular
  • DAS Emergency Responder
  • Data Network Wireless (WLAN/Wi-FI)
  • Distributed Television
  • Electrical Engineering
  • Energy Audit
  • Event Services
  • Fire Protection
  • Integrator Coordinator
  • LEED Consulting
  • Master Planning
  • Mechanical Engineering
  • Plumbing
  • Security Access Control
  • Security Video Suveillance
  • Site Lighting
  • Sound System / Public Address
  • Sports Lighting
  • Telecom Infrastructure
  • Telephone System
  • Video Boards and Production