Heron Tower

London, United Kingdom

First fit out in a building separated into three “floor villages” with separate systems

Heron Tower is sub divided into three “floor villages,” each with its own 3-story atrium and dedicated ventilation plant. As the building’s first fit out, the 24,000 SF CAT B fit out for solicitors McDermott Will required the complex process of integrating the systems interface with the base building systems, including the essential cooling heat-rejection system and the smoke-control system. This fast track project was completed in 14 weeks, requiring the early procurement of long lead plant items and an out-of-sequence design process.