Gunnison-Crested Butte Regional Airport Redevelopment

Gunnison Colorado, United States

Airport terminal that runs on geothermal energy in one of the coldest towns in the U.S.

Renovation of a 40,000 SF airport terminal featuring a distributed geothermal heat pump system. Water circulates from a nearby geothermal field to air-source heat pumps, optimizing energy use based on occupancy detected by CO2 sensors. The system adjusts ventilation and conditioned air to enhance efficiency and comfort.

Services

  • Mechanical Engineering
  • Electrical Engineering
  • Plumbing
  • Technology
  • Building Performance

Recognition

Honor Award, ACEC Colorado, 2024
BEST Maker Award, IIDA Rocky Mountain Chapter, 2024