• Barlow Respiratory
    Hospital Replacement Hospital

    Los Angeles, CA

    Complete mechanical and electrical engineering services for a new 85,000 sf, 62-Bed Replacement Hospital, a new 15,600 sf, Non-Acute Care Facility and a new 124-Car Parking Structure.

    Clovis Community Medical Center
    Expansion

    Clovis, CA

    Design of complete technology systems for the Phase C Expansion, a new, 5-story, 120,000 sf, 148 bed tower and expansion of the existing ER.

    Fresno Community Hospital

    Fresno, CA

    This new state-of-the-art trauma building serves the central region of California. The 316,000 sf, 6-story facility includes emergency, surgery, ICU, radiology, autopsy/morgue and burn unit and two rooftop helipads.
  • Grand River
    Medical Center

    Rifle, CO

    The $25 million expansion included a new 60,000 sf medical office building, 9,000 sf clinic renovation, and 12,000 sf hospital expansion.

    Henry Mayo Newhall Memorial Hospital

    Valencia, CA

    New 6-story patient tower with 116-beds and helipad is designed with shell space for future expansion and will be constructed in three phases. Design build.

    LAC+USC Medical Center

    Los Angeles, CA

    $900M state-of-the-art, acute care medical center, with Nursing Tower, Outpatient Building, Diagnostic & Treatment Building, and a Central Plant. The power plant was placed below grade which added complexity to the design of air intakes and exhausts required for plant equipment. The plant was designed for easy access for service and to permit the efficient removal and
  • replacement of equipment. The use of power efficient and cost effective high voltage generators and Automatic Transfer Switches dramatically increased the reliability of the system and reduced significant material cost.
    The team worked closely with OSHPD, the manufacturer, and testing authority, to design, approve and install the first UL Listed ATS of the type used in the design.

    Mercy Medical Center
    Replacement Hospital

    Merced, CA

    Complete mechanical engineering services for this new 240,000 sf replacement hospital and new 10,000 sf central plant.

    Mercy San Juan
    Medical Center

    Carmichael, CA

    Provided complete mechanical and electrical engineering for a new patient tower and central plant of approximately 135,000 sf, remodeling of existing 39,000 sf hospital a new parking structure.
  • Palomar Medical Center West

    Escondido, CA

    Phase I included site utility planning, a 10-level, 450-bed hospital, and new central utility plant to accommodate the buildings and a planned Phase II medical office building. The complex is one of the largest single construction projects ever to be done through Integrated Project Delivery. The facility features sustainable design consistent with that for LEED Certification. Using a sophisticated builing management system, it operates with low energy and water consumption and high efficiency HVAC systems are emphasized. The stress-reducing and healing powers of nature, utilizing daylight, views, and access to the outdoors.

    Presbyterian
    Intercommunity Hospital

    Whittier, CA

    Complete MEP design services for a new 160,000 sf, 4-story foundation hospital tower and new cooling plant.
  • Rangely Hospital

    Grand Junction, CO

    66,000 sf new acute care hospital includes emergency services, procedure rooms, rehabilitation, long-term care, and medical office wing.

    Royal National
    Orthopaedic Hospital

    London, UK

    The appointment included assisting the Client in the formation of the Employers Requirement document, and production of the Building Services Performance Specification to allow the project to be competitively tendered through PFI. ME Engineers also undertook the master plan design for the infrastructure and enabling works to service the new development.
  • Santa Barbara Cottage Replacement Hospital

    Santa Barbara, CA

    Full service replacement hospital is the largest in the region. The 470,000 sf new hospital includes a 300-bed Acute Care Medical Center, with 160,000 sf for nursing wings, a 280,000 sf Diagnostic and Treatment Building and a 26,000 sf Central Plant. A residential setting and strict city design guidelines imposed unique aesthetic challenges, particularly for the Central Plant which was designed to minimize the impact of plant discharge on the campus and surrounding neighborhood.

    USC University Hospital

    Los Angeles, CA

    State-of-the-art 10-story hospital consists of 160 Beds, 13 Operating Rooms, and Central Plant design. Services included complete low voltage system such as Voice/Data, Television, Nurse Call, Public Address, Patient Information, Intercom, Fire Alarm services.
  • Valley Presbyterian
    Hospital

    Van Nuys, CA

    MEP design for new replacement patient tower and existing Central Plant upgrade. The new seismically-reinforced design of the 120,000 sf patient tower has 64 state-of-art ICU rooms and 128 medical/surgical patient rooms.

    Ventury County Medical Center

    Ventura, CA

    New $300M hospital replaced a wing of the county's main hospital with an added 122-bed facility that features an expanded emergency department and a $2.5M da Vinci robotic surgery system. Work included relocation of the hospital's steam plant to the new building. Target: LEED for Healthcare Silver