• 1601 Lowell
    Life Care Hospital

    Denver, CO

    This existing five-story hospital, constructed in the 1960s, was upgraded including new patient rooms, patient treatment areas and mechanical central plant upgrades. A new 30,000 sf wing to the building houses a new ICU suite, patient rooms, imaging and operating rooms.

    Cedars Sinai
    Medical Center
    Multiple Renovations

    Los Angeles, CA

    The firm provided services for multiple renovations, including the Pediatric Acute Care Unit and Cardio Thoracic, Pulmonary and Reparatory Therapy Clinic.

    Hospital for Joint Diseases Child Life Center

    New York, NY

    Renovation of adult patient floor to construct a Child Life Center. Full floor MEP modification and upgrade included new power, air conditioning, medical gas and fire protection systems in all patient rooms.
  • Kaiser Riverside
    Medical Center
    Fire Alarm Replacement

    Riverside, CA

    Project included electrical engineering services for the fire alarm system upgrade to the existing 700,000 sf hospital and clinic.

    Maria Farerri
    Children’s Hospital

    Valhalla, NY

    The expansion and alteration of the existing pediatric
and adult emergency room included 2,000 sf of new space and a reconfiguration
of the existing emergency room. Completed in phases to allow the emergency room to remain operational at its original capacity during construction.

    Mission Hospital
    Neurology Suite
    Conversion

    Mission Viejo, CA

    Provided mechanical engineering services to convert the 2nd Floor space to a new Neurology Surgery Suite.
  • Northern Westchester
    Hospital Center

    Mt. Kisco, NY

    Multiple projects include emergency power upgrades, OR electrical system upgrades, and Institute of Aesthetic Surgery and Medicine renovation.

    NYU Langone
    Medical Center -
    Radiology Department Relocation

    New York, NY

    Renovation of office and medical spaces to facilitate the relocation of medical and support personnel. Scope included demolition and replacement of mechanical, electrical, and sprinkler systems, installation of new supplemental mechanical systems to facilitate changing occupancies, as well as integration of new mechanical systems into existing building services.
  • Presbyterian Intercommunity Hospital

    Whittier, CA

    Multiple renovations, replacements and upgrades including two expansions and renovations of the Emergency Department. Other projects include Pharmacy, Optical Center, Central Plant, Dishwasher, Fire Alarm, R/F Room Equipment, IDF Closets, and HVAC equipment.

    Providence Little Company
    of Mary Hospital
    MEP Upgrades

    Torrance, CA

    Complete MEP services to upgrade existing system infrastructures and remodel existing distribution systems for 54,000 sf Psychiatric Facility.

    Redlands Community
    Hospital - Remodel

    Redlands, CA

    Project included remodel of surgery space and adjacent corridors, assessment of the existing mechanical, electrical and plumbing systems at the central plant to support the master plan, including a description of necessary repairs, modifications or upgrades to ensure proper operation of all systems.
  • VA Medical Center
    Northport
    Endoscopy Suite

    Northport, NY

    Renovation of 20,000 sf of existing treatment space to construct a new outpatient endoscopy suite with procedure, recovery and support rooms.

    Westchester Medical
    Center
    Immunocompromised
    Protective Suites

    Valhalla, NY

    Two-phase renovation of 60 existing patient rooms to construct a new immunocompromised protective environment for chemotherapy patients. HVAC systems feature positive pressurized air systems with central and local HEPA filtration. Plumbing systems feature central and local HEPA filtration to remove contaminants from water supplied to showers and sinks.
  • Westchester Medical
    Center - MEP Infrastructure Replacement Program

    Valhalla, NY

    $50M project to upgrade medical center’s mechanical and electrical infrastructure in multiple phases over five years. Renovations include:
    15 operating rooms; realignment of boiler plants; new 4,500 ton chiller plant; expansion of existing cooling tower system; new 2.5 MW generator plant; and replacement of 30 air handlers, 40 exhaust/return fans, and medical air and vacuum systems. Work is phased, to allow the facility to continue normal operations during construction.
  • Westchester Medical
    Center - Pediatric Open Heart Operating Room

    Valhalla, NY

    Reconstruction of an existing Operating Room to construct a high air flow environment capable of rapid and extreme temperature changes which can be controlled by the surgical team based on the patient’s requirements. Room air change rates are adjustable from the code minimum of 15 ACH to as high as 30 ACH. A cleaning mode displaces any contamination prior to terminal cleaning of room.