• 1 Lansdowne Road

    Croydon, UK

    This mixed-use development includes a 20-story commercial office block incorporating 200,000 sf of office space. Two 45-story residential towers with 450 private residences, a 15-story Intercontinental Hotel with 300 bedrooms, leisure club, conference and banquet, 75 private apartments, and a 15-story podium incorporating retail with a two-level basement and car park.

    1144 Fifteenth Street Tower

    Denver, CO

    This 662,900 sf, Class AA trophy office tower is pre-certified LEED Gold. The 40-story tower features designs to enhance tenant comfort and productivity, including an advanced air filtration system and superior energy efficiency.

    609 Main Street

    Houston, TX

    47-floor office tower includes fitness and conference centers and 1,500-space parking garage. Sustainable design with a sophisticated “Dual Path,” underfloor air HVAC system. Target: LEED Gold
  • 9378 Wilshire Boulevard

    Beverly Hills, CA

    Three-story mixed-use commercial and retail building.

    Amgen Building 28

    Thousand Oaks, CA

    Shell and core and tenant improvements for a new 5-story 235,000 sf office building.

    Charles Schwab Corporate Campus

    Lone Tree, CO

    650,000 sf center for 2,800 staff in three 5-story buildings, with two parking garages, amenities/conference center and customer retail building on 47 acres. MEP systems were designed to allow for the separation and sale of part of the facilities. Target: LEED Gold & Platinum.

    Denver Newspaper Agency

    Denver, CO

    This 11-story hi-rise includes two sub-grade levels and five levels of parking. The 310,000 sf office and retail space includes a data center with a raised floor and stand-alone cooling system.
  • Fidessa at One Old Jewry

    Landmark New York, NY

    Fidessa at One Old Jewry is an office building in the center of London’s Financial District. 60,000 square metres over 9 floors were fitted out on a contract with a 20 week completion schedule.

    The Harlequin Building Modernisation

    London, UK

    Renovation and expansion of an existing 5-story office building to CAT A standards. This included new facades and two floors plus ground floor retail. BREEAM Excellent rating.

    H+R Block Corporate Headquarters

    Kansas City, MO

    This 17-story tower has 400,000 sf of office and administration space, street level retail, a professional performance theater, and a public plaza. The Center includes conference & training rooms, a cafeteria, a full kitchen, pre-function areas, a raised-floor system, and a 15,000 sf data center.
  • Hines Expedia Tower

    Bellevue, WA

    This 18-story office tower features efficient floor plates with extensive daylight penetration and a state-of-the-art mechanical system. BIM was used to support an integrated process of design and technical expression in developing a high performance glazing system. LEED Gold certified.

    Iron Mountain

    Various Locations, UK

    Undertook over 40 projects for Iron Mountain, providing the mechanical, electrical, public health and fire protection design and supervision services. ME Engineers has designed over 12 million sf of storage and support facilities with Iron Mountain.

    News International

    London, UK

    MEP solutions and sustainability advice for the redevelopment of the existing Wapping print works facility into an 80,000m² Headquarters office building to facilitate the consolidation of the News International factions into a common facility.
  • Playa Vista
    Office Complex

    Playa Vista, CA

    New shell office building complex consists of two, five-level buildings, totaling 450,000 sf, one level of subterranean parking for 
530 cars, a 4-level above ground structure for 850 cars, and provision for future food service tenants.

    SCOR Reinsurance Offices

    New York, NY &
    Charlotte, NC

    Gut renovation of 75,000 sf of executive office space including bullpens, private offices, conference rooms and bathrooms. Project was completed in a phased plan with continuous occupancy of the spaces.

    Societe Generale

    London, UK

    Refits in two locations:
    Bishopsgate: CAT B fit out of the trading floor support areas, resolution of overheating problems on the trading floor, recommissioning of the cooling system, a new reception and a suite of meeting spaces featuring leading edge audio visual.
    Tower Hill: Restack project redesigned MEP services
  • to accommodate 125 new trading desks,power upgrade, increase in power resilience and reconfiguration of HVAC systems to provide dedicated systems for trading floors. Completed under full occupancy.

    Thoreau Center for
    Sustainability @ NY 55 Exchange

    New York, NY

    This office renovation used an environmentally sustainable design plan incorporating elements such as recycled building materials, non-toxic paints and Class A energy-efficient green design with high efficiency mechanical systems. The Center serves as an innovative model of sustainable building operation. LEED certified.

    Union Station South Wing

    Denver, CO

    This 125,000 sf, $18M core and shell office building consists of ground floor retail space and four floors of office space. LEED Gold certified.
  • Victory Center

    Dallas, TX

    23-story trophy office tower with parking structure and premium amenities. Designed to achieve LEED Gold certification.

    VMware Corporate Campus

    Palo Alto, CA

    Green corporate office complex includes 500,000 sf of new construction and redevelopment of 600,000 sf of existing buildings on the Stanford Research Park, with three new parking structures. Sustainable features include generous natural daylight, operable windows in each office, and energy-efficient lighting and mechanical systems. The project is being completed in four phases.